Questions
6 Risk analysis of a project is done in :
A System Analysis phase
B Feasibility Study
C Implementation phase
D Maintenance phase

Answer: Option [B]
7 In which step of SDLC project termination could be done ?
A Design phase
B System Maintenance phase
C Feasibility Study phase
D Coding phase

Answer: Option [C]
Advertisement
Article and Schedule Quiz Start Test!

DOWNLOAD CURRENT AFFAIRS PDF FROM APP

8 The fundamental objective of system analysis is to :
A understand computer hardware
B train managers in mathematical analysis
C study and understand a complex system and modify it in some way
D run simulation programmes

Answer: Option [C]
9 Which one of the following is not stage of SDLC ?
A System analysis
B Problem identification
C System Design
D Feasibility study

Answer: Option [B]
10 An iterative process of system development in which requirements are converted to a working system that is continually revised through close work between an analyst and user is called
A Waterfall modeling
B Iterative modeling
C Spiral modeling
D None of these above

Answer: Option [C]

ADRE 2.0 FULL LENGTH MOCK TEST

Take Mock Tests

Missiles Mock Test Start Test!
SSC MTS Mock Test Start Test
IBPS CLERK MOCK TEST Start Test
SSC MTS 2022 JULY 26 Shift 1 (ENGLISH) Start Test!
SSC GD Previous Year Paper 2021 Nov 17 Shift - I (Hindi) Start Test!
SSC CGL Tier - 1 PYP 2022 April 21 Shift- 1 (ENGLISH) Start Test!
MPSC PAPER I MOCK TEST 1 (ENGLISH) Start Test!
IB Security Assistant Mock test 1 (english) Start Test!
UP POLICE CONSTABLE MOCK TEST 1 Start Test!
DELHI POLICE CONSTABLE MOCK TEST 1 (HINDI) Start Test!

Chapters

Advertisement