Online GK Series

This site is dedicated to the aspirants of competitive exams SSC, UPSC, Railways, Postal Assistants, Bank, GATE and NET

Short Interview Questions and Answers on Software Engineering

Questions
6 Risk analysis of a project is done in :
A System Analysis phase
B Feasibility Study
C Implementation phase
D Maintenance phase

Answer: Option [B]
7 In which step of SDLC project termination could be done ?
A Design phase
B System Maintenance phase
C Feasibility Study phase
D Coding phase

Answer: Option [C]
8 The fundamental objective of system analysis is to :
A understand computer hardware
B train managers in mathematical analysis
C study and understand a complex system and modify it in some way
D run simulation programmes

Answer: Option [C]
9 Which one of the following is not stage of SDLC ?
A System analysis
B Problem identification
C System Design
D Feasibility study

Answer: Option [B]
10 An iterative process of system development in which requirements are converted to a working system that is continually revised through close work between an analyst and user is called
A Waterfall modeling
B Iterative modeling
C Spiral modeling
D None of these above

Answer: Option [C]

Computer Science Books

Chapters

Please Like Us
Brand