Short Interview Questions and Answers on Software Engineering

Questions
6 Risk analysis of a project is done in :
A System Analysis phase
B Feasibility Study
C Implementation phase
D Maintenance phase

Answer: Option [B]
7 In which step of SDLC project termination could be done ?
A Design phase
B System Maintenance phase
C Feasibility Study phase
D Coding phase

Answer: Option [C]
Advertisement
ADRE 2.0 Mock Test - 5 Start Test
ADRE 2.0 Mock Test - 5 Start Test

DOWNLOAD CURRENT AFFAIRS PDF FROM APP

8 The fundamental objective of system analysis is to :
A understand computer hardware
B train managers in mathematical analysis
C study and understand a complex system and modify it in some way
D run simulation programmes

Answer: Option [C]
9 Which one of the following is not stage of SDLC ?
A System analysis
B Problem identification
C System Design
D Feasibility study

Answer: Option [B]
10 An iterative process of system development in which requirements are converted to a working system that is continually revised through close work between an analyst and user is called
A Waterfall modeling
B Iterative modeling
C Spiral modeling
D None of these above

Answer: Option [C]

ADRE 2.0 MOCK TEST

Take Mock Tests

Government Schemes Mock Test Start Test!
Political Science Mock Test – 42 Start Test
History Test – 190 Start Test
Quantitative Aptitude Test Start Test!
Trigonometry - Mock Test Start Test!
Data Interpretation - Mock Test Start Test!
General Awareness - Mock Test Start Test!
Reasoning Ability - Mock Test Start Test!
Englist(Antonyms) Mock Test 1 Start Test!
Quantitative Aptitude (Percentage) Mock Test Start Test!
Economy Mock Test 1 Unlock Test!
Books & Authors - Test 2 Unlock Test!

Chapters

Advertisement