{"id":173652,"date":"2025-06-24T15:23:27","date_gmt":"2025-06-24T09:53:27","guid":{"rendered":"https:\/\/www.gkseries.com\/blog\/?p=173652"},"modified":"2025-06-24T15:23:32","modified_gmt":"2025-06-24T09:53:32","slug":"cm-yogi-inaugurates-%e2%82%b97283-cr-gorakhpur-link-expressway-in-azamgarh","status":"publish","type":"post","link":"https:\/\/www.gkseries.com\/blog\/cm-yogi-inaugurates-%e2%82%b97283-cr-gorakhpur-link-expressway-in-azamgarh\/","title":{"rendered":"CM Yogi Inaugurates \u20b97,283 Cr Gorakhpur Link Expressway in Azamgarh"},"content":{"rendered":"\n<p>On June 20, 2025, Chief Minister Yogi Adityanath inaugurated the Gorakhpur Link Expressway in Azamgarh, an important step in infrastructure development for the state of Uttar Pradesh. At a construction cost of over \u20b97,283 crore, the 91.35 km-long expressway is part of the government&#8217;s initiative to position U.P. as an &#8216;Expressway State&#8217; and foster regional connectivity, investment, and industrial growth.<\/p>\n\n\n\n<p>The Gorakhpur Link Expressway connects key districts, including Azamgarh, Sant Kabir Nagar, Ambedkar Nagar, and Gorakhpur. It will also act as an important part of U.P.&#8217;s metamorphosis from a \u2018BIMARU\u2019 state to a first-class innovator in infrastructure and economic development. This upcoming expressway is an example of the ongoing work of the \u2018double-engine government\u2019 to fortify connectivity and regional development within eastern Uttar Pradesh.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Features of the Gorakhpur Link Expressway<\/h3>\n\n\n\n<p>\u2022 Length: 91.35 km<\/p>\n\n\n\n<p>\u2022 Cost: \u20b97,283 crore<\/p>\n\n\n\n<p>\u2022 Dedicating Authority: Chief Minister Yogi Adityanath Date: June 20, 2025<\/p>\n\n\n\n<p>\u2022 Districts served: Azamgarh, Gorakhpur, Sant Kabir Nagar, Ambedkar Nagar<\/p>\n\n\n\n<p>\u2022 Connectivity: The expressway connects directly to the Purvanchal Expressway, along with access to additional corridors of connectivity.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Objectives &amp; Significance<\/h3>\n\n\n\n<p>\u2022 Regional development and investment opportunities<\/p>\n\n\n\n<p>\u2022 Better road connectivity within eastern U.P. with the add-on benefits of tourism and trade reach.<\/p>\n\n\n\n<p>\u2022 Increased employment in local economies<\/p>\n\n\n\n<p>\u2022 Improve logistics, agriculture, and industrial growth.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Context &amp; Background<\/h3>\n\n\n\n<p>BIMARU States: Bihar, Madhya Pradesh, Rajasthan, Uttar Pradesh<\/p>\n\n\n\n<p>States that historically have not developed completely, and just until this year, the state has already completed three major expressways,<\/p>\n\n\n\n<p>\u2022 Purvanchal Expressway \u2013 340 km<\/p>\n\n\n\n<p>\u2022 Bundelkhand Expressway \u2013 300 km<\/p>\n\n\n\n<p>\u2022 Gorakhpur Link Expressway \u2013 91.35 km<\/p>\n\n\n\n<p>There are currently six expressways undergoing construction, showcasing an unprecedented purposeful shift toward infrastructure led growth.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>On June 20, 2025, Chief Minister Yogi Adityanath inaugurated the Gorakhpur Link Expressway in Azamgarh, an important step in infrastructure development for the state of Uttar Pradesh. At a construction cost of over \u20b97,283 crore, the 91.35 km-long expressway is part of the government&#8217;s initiative to position U.P. as an &#8216;Expressway State&#8217; and foster regional [&hellip;]<\/p>\n","protected":false},"author":419,"featured_media":173654,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5373],"tags":[83],"offerexpiration":[],"class_list":["post-173652","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-current-affairs-june-2025","tag-uttar-pradesh-current-affairs"],"_links":{"self":[{"href":"https:\/\/www.gkseries.com\/blog\/wp-json\/wp\/v2\/posts\/173652","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.gkseries.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.gkseries.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.gkseries.com\/blog\/wp-json\/wp\/v2\/users\/419"}],"replies":[{"embeddable":true,"href":"https:\/\/www.gkseries.com\/blog\/wp-json\/wp\/v2\/comments?post=173652"}],"version-history":[{"count":1,"href":"https:\/\/www.gkseries.com\/blog\/wp-json\/wp\/v2\/posts\/173652\/revisions"}],"predecessor-version":[{"id":173655,"href":"https:\/\/www.gkseries.com\/blog\/wp-json\/wp\/v2\/posts\/173652\/revisions\/173655"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.gkseries.com\/blog\/wp-json\/wp\/v2\/media\/173654"}],"wp:attachment":[{"href":"https:\/\/www.gkseries.com\/blog\/wp-json\/wp\/v2\/media?parent=173652"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.gkseries.com\/blog\/wp-json\/wp\/v2\/categories?post=173652"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.gkseries.com\/blog\/wp-json\/wp\/v2\/tags?post=173652"},{"taxonomy":"offerexpiration","embeddable":true,"href":"https:\/\/www.gkseries.com\/blog\/wp-json\/wp\/v2\/offerexpiration?post=173652"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}