Estimation and Costing MCQs

Which of the following is incorrect?

Which of the following is incorrect?

According-Indian Standards Institute, the actual -Size of modulni-bricks is

According-Indian Standards Institute, the actual -Size of modulni-bricks is

The plinth area of a building includes

The plinth area of a building includes

The most reliable estiamte is

The most reliable estiamte is

The method of estimation of cost function, by making the opinions and analysis about cost and cost drivers is classified as

The method of estimation of cost function, by making the opinions and analysis about cost…

The work measurement method of cost estimation is also called

The work measurement method of cost estimation is also called

The cost analysis method, which uses mathematical method to use fit between past data observations and cost functions is termed as

The cost analysis method, which uses mathematical method to use fit between past data observations…

Industrial engineering method is used to analyze the relationship between

Industrial engineering method is used to analyze the relationship between

Which soil will have the maximum permissible load per square metre?

Which soil will have the maximum permissible load per square metre?