Which of the following is incorrect?
Which of the following is incorrect?
2 years ago
According-Indian Standards Institute, the actual -Size of modulni-bricks is
The method of estimation of cost function, by making the opinions and analysis about cost…
The work measurement method of cost estimation is also called
The cost analysis method, which uses mathematical method to use fit between past data observations…
Industrial engineering method is used to analyze the relationship between
An analysis and estimation method of cost, by classifying cost accounts as fixed or variable…
Which soil will have the maximum permissible load per square metre?