(21) Which of the following is not included in prevention cost?
[A] equipment calibration and maintenance
[B] formal technical reviews
[C] test equipment reviews
[D] quality planning reviews
Answer: equipment calibration and maintenance
(22) Software quality assurance consists of which function of management.
[A] reporting functions
[B] auditing functions
[C] both and b
[D] all of the mentioned
Answer: both and b

DOWNLOAD CURRENT AFFAIRS PDF FROM APP

Article and Schedule Quiz Start Test!
(23) A product which is manufactured by using the degree of the design specification…
[A] Quality of conformance
[B] Quality Control
[C] Quality Assurance
[D] None of the above
Answer: Quality of conformance
(24) Select which option is not true about SQA…?
[A] Evaluations to be performed
[B] Documents that are produced by the SQA team.
[C] Audits and reviews to be performed by the team
[D] Amount of technical work to be performed
Answer: Evaluations to be performed
(25) Which quality is measured as a foundation of requirement…?
[A] Software
[B] Programmers
[C] Hardware
[D] None of the mentioned
Answer: Software
(26) A six sigma process has defect level below ______ defects per million opportunities.
[A] 6.7
[B] 3.4
[C] 5.6
[D] none of the above
Answer: 3.4
(27) The process capability is calculated as
[A] (USL-LSL)/6σ
[B] (USL+LSL)/6σ
[C] (USL-LSL)/3σ
[D] (USL+LSL)/3σ
Answer: (USL-LSL)/6σ
(28) The control chart used for the number of defects per unit is
[A] p-chart
[B] c-chart
[C] Mean chart
[D] Range chart
Answer: c-chart
(29) The control chart used for the fraction of defective items in a sample is
[A] c-chart
[B] p-chart
[C] Range chart
[D] Mean chart
Answer: p-chart
(30) Dispersion of a process in monitored in
[A] Range chart
[B] c-chart
[C] Mean chart
[D] p-chart
Answer: Range chart
31 Central tendency of a process is monitored in
[A] c-chart
[B] Range chart
[C] Mean chart
[D] p-chart
Answer: Mean chart
32 The chart used to monitor attributes is
[A] p-chart
[B] Mean chart
[C] Range chart
[D] All of the above
Answer: p-chart
33 The chart used to monitor variable is
[A] Range chart
[B] c-chart
[C] p-chart
[D] All of the above
Answer: Range chart
34 The dividing lines between random and non random deviations from mean of the distribution are known as
[A] two sigma limits
[B] control limits
[C] lower control limit
[D] upper control limit
Answer: control limits
35 The percent of the sample means will have values that are within ±3 standard deviations of the distribution mean is
[A] 99.7
[B] 97.6
[C] 95.5
[D] 96.7
Answer: 99.7
36 The mean of sampling distribution is
[A] equal to mean of process distribution
[B] more than mean of process distribution
[C] less than mean of process distribution
[D] any of the above
Answer: equal to mean of process distribution
37 High cost, low volume items requires
[A] 100% inspection
[B] intensive inspection
[C] no inspection
[D] little inspection
Answer: intensive inspection
38 Match the following:

A) Quality assurance - 1) Process oriented

B) Quality control - 2) National physical laboratory

C) Quality management - 3) Product oriented

D) National measurement system - 4) Overall programmer of QA

[A] A-3, B-4, C-2, D-1
[B] A-2, B-3, C-1, D-4
[C] A-1, B-3, C-4, D-2
[D] A-4, B-1, C-3, D-2
Answer: A-1, B-3, C-4, D-2
39 What is the first step of QA?
[A] Identification of customer need
[B] Servicing
[C] Development of standards
[D] Material control
Answer: Identification of customer need
40 Arrange the steps of QA in ascending order?
[A] Customer needs, design development, material control, process control, finished product
[B] Material control, servicing, process control, material control, design development
[C] Material control, process control, customer need, design development, finished product
[D] Customer needs, material control, design development, process control, marketing
Answer: Customer needs, design development, material control, process control, finished product

Take Mock Tests

Missiles Mock Test Start Test!
SSC MTS Mock Test Start Test
IBPS CLERK MOCK TEST Start Test
SSC MTS 2022 JULY 26 Shift 1 (ENGLISH) Start Test!
SSC GD Previous Year Paper 2021 Nov 17 Shift - I (Hindi) Start Test!
SSC CGL Tier - 1 PYP 2022 April 21 Shift- 1 (ENGLISH) Start Test!
MPSC PAPER I MOCK TEST 1 (ENGLISH) Start Test!
IB Security Assistant Mock test 1 (english) Start Test!
UP POLICE CONSTABLE MOCK TEST 1 Start Test!
DELHI POLICE CONSTABLE MOCK TEST 1 (HINDI) Start Test!