May 2023

In which year, West Bengal State Electricity Board (WBSEB) was reconstituted and formed into two new boards?

In which year, West Bengal State Electricity Board (WBSEB) was reconstituted and formed into two new boards?

Question In which year, West Bengal State Electricity Board (WBSEB) was reconstituted and formed into two new boards? Type multiple_choice Option 2006 incorrect Option 2007 correct Option 2005 incorrect Option 2004 incorrect Solution On May 1st, 1955, WBSEB (West Bengal State Electricity Board) was established and operated until its dissolution on March 31st, 2007. It

In which year, West Bengal State Electricity Board (WBSEB) was reconstituted and formed into two new boards? Read More »

In respect of which of the following social reform Vidyasagar waged a long and memorable struggle?

In respect of which of the following social reform Vidyasagar waged a long and memorable struggle?

Q. In respect of which of the following social reform Vidyasagar waged a long and memorable struggle? (a) Widow remarriage (b) Abolition of child marriage (c) Education of women (d) Campaign against polygamy Ans: (a) Widow remarriage Explanation: In respect of (a) Widow remarriage, Ishwar Chandra Vidyasagar waged a long and memorable struggle. Ishwar Chandra

In respect of which of the following social reform Vidyasagar waged a long and memorable struggle? Read More »

Match the following lists

Match the following lists

Option a-4, b-1, c-2, d-3 incorrect Option a-2, b-1, c-4, d-3 incorrect Option a-3, b-4, c-2, d-1 correct Option a-1, b-4, c-3, d-2 incorrect Solution The Massanjore hydro-electric project, fueled by the waters of the Mayurakshi River, is located in the Birbhum district of West Bengal. The Sagardighi Project, on the other hand, is a

Match the following lists Read More »

Match the following lists

Match the following lists

Option a-1, b-2, c-3, d-4 incorrect Option a-2, b-3, c-1, d-4 incorrect Option a-4, b-3, c-2, d-1 correct Option a-2, b-4, c-1, d-3 incorrect Solution The Bakreshwar Project is situated in the Birbhum district, while the Sagardighi Project is located in the Murshidabad district. The Bandel Project is situated in the Hooghly district, and the

Match the following lists Read More »

Scroll to Top