September 2023

Match the iconic architectural examples in Group-I with their predominant structural systems in Group-II

Match the iconic architectural examples in Group-I with their predominant structural systems in Group-II

Q. Match the iconic architectural examples in Group-I with their predominant structural systems in Group-II   Group-I   Group-II P S. Maria del Fiore Cathedral, Florence 1 Shell Q Notre Dame Cathedral, Paris 2 Suspended roof R Olympic Arena, Tokyo 3 Space frame S Bahá’i Temple, Delhi 4 Double-walled dome     5 Flying buttress

Match the iconic architectural examples in Group-I with their predominant structural systems in Group-II Read More »

Match the photometric quantities in Group-I with their respective units in Group-II

Match the photometric quantities in Group-I with their respective units in Group-II

Q. Match the photometric quantities in Group-I with their respective units in Group-II   Group-I   Group-II P Illuminance 1 Candela Q Luminous Intensity 2 Candela/sqm R Luminance 3 Lumens/sqm S Luminous Efficacy 4 Lumens/watt     5 Lumens (A) P-3, Q-2, R-5, S-4                                   (B) P-5, Q-4, R-2, S-1 (C) P-5, Q-1, R-2, S-3                                   (D)

Match the photometric quantities in Group-I with their respective units in Group-II Read More »

Associate the fire safety requirements for high rise buildings in Group-I with corresponding standards of

Associate the fire safety requirements for high rise buildings in Group-I with corresponding standards of

Q. Associate the fire safety requirements for high rise buildings in Group-I with corresponding standards of the National Building Code of India 2016 in Group-II   Group-I   Group-II P Minimum Refuge area 1 12.5 sqm/person Q Maximum Travel distance 2 2.0 m R Maximum Occupant load 3 0.3 sqm/person S Minimum Stair case width

Associate the fire safety requirements for high rise buildings in Group-I with corresponding standards of Read More »

Match the planning documents in Group-I with their respective government schemes in Group-II

Match the planning documents in Group-I with their respective government schemes in Group-II

Q. Match the planning documents in Group-I with their respective government schemes in Group-II   Group-I   Group-II P Integrated Cluster Action Plan 1 NULM Q Service Level Improvement Plan 2 Make in India R Housing for All Plan of Action 3 RuRBAN mission S City Livelihood Centre Development Plan 4 PMAY     5

Match the planning documents in Group-I with their respective government schemes in Group-II Read More »

Scroll to Top