April 2024

Payal and pooja complete a work in 14 days doing together if payal works for 3.5 days and pooja for 9.5 days

Payal and pooja complete a work in 14 days doing together if payal works for 3.5 days and pooja for 9.5 days

Payal and pooja complete a work in 14 days doing together if payal works for 3.5 days and pooja for 9.5 days, they finish half work. In how much time pooja alone complete the work? a)            20days b)            23days c)            22days d)            24days Sol: 3.5 days Payal + 9.5 days Pooja=half work 3.5 days Payal […]

Payal and pooja complete a work in 14 days doing together if payal works for 3.5 days and pooja for 9.5 days Read More »

The distance between PQ is 203 km. two boats A and B start moving towards each other at the same time from point P and Q

The distance between PQ is 203 km. two boats A and B start moving towards each other at the same time from point P and Q

The distance between PQ is 203 km. two boats A and B start moving towards each other at the same time from point P and Q respectively. B is upstream and other is downstream. If speed of A and B in still water is 11.4km/hr. and 17.6km/hr. respectively. Then in how much time they will

The distance between PQ is 203 km. two boats A and B start moving towards each other at the same time from point P and Q Read More »

Train A takes 35 minutes more than train B to travel a distance of 460 km. Due to engine trouble speed of train B falls by

Train A takes 35 minutes more than train B to travel a distance of 460 km. Due to engine trouble speed of train B falls by

Train A takes 35 minutes more than train B to travel a distance of 460 km. Due to engine trouble speed of train B falls by a quarter, so it takes 30 minutes more than train A to complete the same journey. What is the speed of train A (in km/hr)? a) 110 b) 90

Train A takes 35 minutes more than train B to travel a distance of 460 km. Due to engine trouble speed of train B falls by Read More »

Neeraj purchased two articles at same cost price. He sold one article at a profit of 17% and second article at 816

Neeraj purchased two articles at same cost price. He sold one article at a profit of 17% and second article at 816

Neeraj purchased two articles at same cost price. He sold one article at a profit of 17% and second article at 816 Rs more than the fi rst article. If the net profit is 23% then find the cost price of each article? a) 7200Rs b) 6600Rs c) 7000Rs d) 6800Rs Sol:

Neeraj purchased two articles at same cost price. He sold one article at a profit of 17% and second article at 816 Read More »

Chiru while walking diametrically across a semi-circular playground takes 6 min less than if he had kept running around

Chiru while walking diametrically across a semi-circular playground takes 6 min less than if he had kept running around

Chiru while walking diametrically across a semi-circular playground takes 6 min less than if he had kept running around the circular path from P to Q. If he run 25 meter in 50 sec. what is the radius of the playground? a) 155.5 m b) 156.5m c) 157.5 m d) 158.5 m Sol:

Chiru while walking diametrically across a semi-circular playground takes 6 min less than if he had kept running around Read More »

Scroll to Top