The expected out turn of 12 mm plastering with cement mortar is
The expected out turn of 12 mm plastering with cement mortar is
The expected out turn of 12 mm plastering with cement mortar is Read More »
The expected out turn of 12 mm plastering with cement mortar is
The expected out turn of 12 mm plastering with cement mortar is Read More »
For the construction of buildings, the subheads of the estimate are
For the construction of buildings, the subheads of the estimate are Read More »
The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as
The area of the cross-section of a road fully in banking shown in the given figure, is
The area of the cross-section of a road fully in banking shown in the given figure, is Read More »
The cross -sections for a highway is taken at
Pick up the correct statement from the following
Pick up the correct statement from the following Read More »
The brick work is not measured in cu m in case of
The brick work is not measured in cu m in case of Read More »
A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is
The plinth area of a building not includes
The rate of an item of work depends on