Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds HomeEstimation and Costing MCQsDue to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds Share your love WhatsApp Facebook Telegram Twitter Pinterest Q. Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds A. 2.0 % B. 2.5 % C. 4.0 % D. 5.0 % Answer: 5.0 %
A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is