If a³ + b³ = 110 and a + b = 5, then (a + b)² – 3ab is equal to: a) 52 b) 32 c) 42 ...
READ MORE +
If a³ + b³ = 110 and a + b = 5, then (a + b)² – 3ab is equal to: a) 52 b) 32 c) 42 ...
READ MORE +
The base of a prism is in the shape of an equilateral triangle. If the perimeter of the base is 18.45 cm and the height of the prism is 32 cm, then what is the volume (in cm³) of the prism? a) 180√3 b) 324.8√3 c) 434 d) 524 Sol: Perimeter = 18.45 cm Side length = 6.15 cm
READ MORE +
The average marks of four students together is 60%. The average marks of Ram, Dev, Atul and Pankaj individually are 46%, 52%, 70% and 82% respectively. If the average marks of Ram and Dev together is 49% and that of Dev and Atul together is 60%. What is the ratio of number obtained by Ram and ...
READ MORE +
A tank of petrol contains 300 litres of pure petrol initially, Every time a seller sells out 60 litres from the container and replaces each time with 60 liters of kerosene. After replacing the liquid with kerosene 4th time, the total amount of kerosene (in l t) in the mi xture i s? a)122.88 ...
READ MORE +
A swimming pool is fitted with three pipes, the 1st two pipes working simultaneously can fill the pool in the same as the 3rd pipe alone, the 2nd pipe alone fills the pool 5 hours faster than 1st pipe and 4 hours slower than 3rd pipe. In what time 2nd and 3rd pipe together fill the pool? Sol: ...
READ MORE +
A, B and C complete a work in 12,15 and 18 days respectively if they start work together till the whole work complete. Find the share of wages of A,B and C out of he total wages of 1443 Rs? a)220,390,385 b) 285,390,362 c) 362,585,390 d) 585,468,390 Sol: A + B + C = 37 → 1443 ...
READ MORE +
The average of P numbers is Q4, the average of Q numbers is P 4. The average of (P+Q) number is? a) QP b) PQ(P2 + Q2) c) PQ(P2+Q2-PQ) d) P2+Q2 Sol: Sum of P number = PQ⁴ Sum of Q number = QP⁴ (P + Q) = PQ⁴ + QP⁴
READ MORE +
Payal and pooja complete a work in 14 days doing together if payal works for 3.5 days and pooja for 9.5 days, they finish half work. In how much time pooja alone complete the work? a) 20days ...
READ MORE +
The distance between PQ is 203 km. two boats A and B start moving towards each other at the same time from point P and Q respectively. B is upstream and other is downstream. If speed of A and B in still water is 11.4km/hr. and 17.6km/hr. respectively. Then in how much time they will meet. a) ...
READ MORE +
In the given figure, ‘ O’ is the centre of circle and AB = BC and ∠AOB = 90°, then ∠a is. a) 35° b) 55° c) 45° d) 65° Sol: ∆AOB ∆COB AB = BC AO = CO OB = common ⇒ ∠BOC = 90° as ∠AOB = 90° ⇒ AC = diameter ⇒ ∠ABC = 90° ∠ABO = 45°= ∠a
READ MORE +