Neeraj Mittal Takes Charge As DoT Secretary

Neeraj Mittal Takes Charge As DoT Secretary

Neeraj Mittal Takes Charge As DoT Secretary: The Cabinet Appointments Committee (ACC) has appointed Neeraj Mittal, a seasoned Indian Administrative Service (IAS) officer from the 1992 batch, as secretary in the Department of Telecommunications. Daily Current Affairs Quiz: September 2023 Neeraj Mittal’s Current Role and Career Milestones Neeraj Mittal presently holds the position of principal […]

Neeraj Mittal Takes Charge As DoT Secretary Read More »

Anaphase Promoting Complex (APC) is a protein degradation machinery necessary for proper mitosis of animal cells. If APC is defective in a human cell, then which of the following is expected to occur?

Anaphase Promoting Complex (APC) is a protein degradation machinery necessary for proper mitosis of animal cells. If APC is defective in a human cell, then which of the following is expected to occur?

Anaphase Promoting Complex (APC) is a protein degradation machinery necessary for proper mitosis of animal cells. If APC is defective in a human cell, then which of the following is expected to occur? Option 1 : Chromosomes will be not segregateOption 2 : Chromosomes will be fragmentedOption 3 : Chromosomes will not condenseOption 4 :

Anaphase Promoting Complex (APC) is a protein degradation machinery necessary for proper mitosis of animal cells. If APC is defective in a human cell, then which of the following is expected to occur? Read More »

In a NC milling operation, the tool path is generated using absolute programing for the trajectory shown in the figure

In a NC milling operation, the tool path is generated using absolute programing for the trajectory shown in the figure

Q. In a NC milling operation, the tool path is generated using absolute programing for the trajectory shown in the figure (A) G02 X 120.0 Y 60.0 R 60.0; (B) G02 X 60.0 Y 120.0 R 60.0; (C) G03 X 60.0 Y 120.0 R 60.0; (D) G03 X 120.0 Y 60.0 R 60.0; Ans: G02

In a NC milling operation, the tool path is generated using absolute programing for the trajectory shown in the figure Read More »

For a classical (Wilson) model of determining economic order quantity (EOQ) the carrying and ordering costs are Cr and Co

For a classical (Wilson) model of determining economic order quantity (EOQ) the carrying and ordering costs are Cr and Co

Q. For a classical (Wilson) model of determining economic order quantity (EOQ), the carrying and ordering costs are Cr and Co, respectively. For an annual demand D, the minimum yearly total inventory cost is Ans: Option C Sol: Carrying cost = Cr, Ordering Cost = Co, D = Anual demand For economic order quantity EOQ, at

For a classical (Wilson) model of determining economic order quantity (EOQ) the carrying and ordering costs are Cr and Co Read More »

Scroll to Top