period in a septic tank is assumed The detention HomeEstimation and Costing MCQsperiod in a septic tank is assumed The detentionQ. period in a septic tank is assumed The detentionA. 20 minutesB. 30 minutesC. 40 minutesD. NoneAnswer: 30 minutes
A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is