Size, capacity and materials need be specified for HomeEstimation and Costing MCQsSize, capacity and materials need be specified forQ. Size, capacity and materials need be specified forA. Ball valvesB. Bib-cocksC. Stop-cocksD. All the aboveAnswer: All the above
A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is