quantitative aptitude

The given Bar Graph represents the percentages of population in the age groups, X(above 50years)

The given Bar Graph represents the percentages of population in the age groups, X(above 50years)

The given Bar Graph represents the percentages of population in the age groups, X(above 50years), Y(20to 50years), Z(below 20 years) in five different villages, A, B, C, D and E with total population of 5000, 6000, 8000, 4500 and 6000 respectively. What is the ratio of the total number of persons of ages above 50

The given Bar Graph represents the percentages of population in the age groups, X(above 50years) Read More »

Two Beaker A and B having mi xture of milk and water in ratio of 3 : 2 and 2 : 3 respectively. 20 l iter of mixture is taken out from A

Two Beaker A and B having mi xture of milk and water in ratio of 3 : 2 and 2 : 3 respectively. 20 liter of mixture is taken out from A

Two Beaker A and B having mi xture of milk and water in ratio of 3 : 2 and 2 : 3 respectively. 20 l iter of mixture is taken out from A and mix in beaker B, due to which new ratio of milk and water in B becomes 11 : 14 and volume

Two Beaker A and B having mi xture of milk and water in ratio of 3 : 2 and 2 : 3 respectively. 20 liter of mixture is taken out from A Read More »

In the given figure, AP is angle bisector of ∠CAE, CP = 7 cm and PE = 8 cm. find the length of AB

In the given figure, AP is angle bisector of ∠CAE, CP = 7 cm and PE = 8 cm. find the length of AB

In the given figure, AP is angle bisector of ∠CAE, CP = 7 cm and PE = 8 cm. find the length of AB (a)          32 (b)          25 (c)           49 (d)          56 Sol: ∠BAC = ∠CEA, In ∆ABC and ∆ABE, AE = 4x, AC = 3.5x ∆ABC ~ ∆ABE ∠B = common. BC/AB=AC/AE BC/AB=3.5X/4X (AB)²

In the given figure, AP is angle bisector of ∠CAE, CP = 7 cm and PE = 8 cm. find the length of AB Read More »

A takes as much time as B and C together to complete a work. While A and B together can do this piece of work in 10 days

A takes as much time as B and C together to complete a work. While A and B together can do this piece of work in 10 days

A takes as much time as B and C together to complete a work. While A and B together can do this piece of work in 10 days. C alone can do this piece of work in 50 days. In how many days will this work be completed by B alone? (a)          20 days (b)         

A takes as much time as B and C together to complete a work. While A and B together can do this piece of work in 10 days Read More »

Scroll to Top