The estimated time required to complete an activity is known as HomeEstimation and Costing MCQsThe estimated time required to complete an activity is known asQ. The estimated time required to complete an activity is known asA. DurationB. RestraintC. ConstraintD. FloatAnswer: Float
A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is