The expected out turn for earth work in excavation in ordinary soil per workman per day is HomeEstimation and Costing MCQsThe expected out turn for earth work in excavation in ordinary soil per workman per day isQ. The expected out turn for earth work in excavation in ordinary soil per workman per day isA. 1.00 cumB. 2.00 cumC. 3.00 cumD. 4.00 cumAnswer: 3.00 cum
A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is