The expected out turn of 2.5 cm cement concrete floor per mansion per day HomeEstimation and Costing MCQsThe expected out turn of 2.5 cm cement concrete floor per mansion per dayQ. The expected out turn of 2.5 cm cement concrete floor per mansion per dayA. 2.5 sqmB. 5.0 sqmC. 7.5 sqmD. 10 sqmAnswer: 7.5 sqm
A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is