JOIN ADRE 2.0 Telegram Group

Quality Control MCQs | Quality Control Multiple Choice Questions and Answers

Questions
1 What does QA and QC stand for?
A Quality Assurance and Queuing Control
B Quality Adjustment and Quality completion
C Quality Assurance and Quality control
D Quality Adjustment and Queuing control

Answer: Quality Assurance and Quality control
2 What is QA?
A It is the measurement of degree to which a product satisfies the need
B Any systematic process used to ensure quality in the process
C Process of identifying defects
D It is a corrective tool

Answer: Any systematic process used to ensure quality in the process
Advertisement
Article and Schedule Quiz Start Test!

DOWNLOAD CURRENT AFFAIRS PDF FROM APP

3 Which of the following option is correct regarding QA and QC?
A QC is an integral part of QA
B QA is an integral part of QC
C QA and QC are independent to each other
D QC may or may not depend on QA

Answer: QC is an integral part of QA
4 What is the first step of QA?
A Development of standards
B Identification of customer need
C Servicing
D Material control

Answer: Identification of customer need
5 Match the following: A) Quality assurance - 1) Process oriented B) Quality control - 2) National physical laboratory C) Quality management - 3) Product oriented D) National measurement system - 4) Overall programmer of QA
A A-3, B-4, C-2, D-1
B A-2, B-3, C-1, D-4
C A-1, B-3, C-4, D-2
D A-4, B-1, C-3, D-2

Answer: A-1, B-3, C-4, D-2
6 Which of the following is an example of QA?
A Verification
B Software testing
C Validation
D Documentation

Answer: Verification
7 Which of the following option is not correct regarding QA and QC?
A Process capabilities should be monitored on intermittent basis
B Measuring equipment’s must have a calibration certificate
C Normally many inspections are done during the process of manufacturing
D QA depends on the activities of the entire company

Answer: Process capabilities should be monitored on intermittent basis
8 Where the nodal point for National Measurement System is located?
A Bangalore
B Patna
C Bombay
D New Delhi

Answer: New Delhi
9 LCL for the R chart is given by ____
A D3 R
B D2 R
C R – D3 R
D d2 R

Answer: D3 R
10 In phase I application of x and R chart, the control limits obtained from the equations are treated as ______
A Final limits
B Trial limits
C Warning limits
D Pattern limits

Answer: Trial limits
11 The process standard deviation is given by ____
A R/d2
B Rd2
C 1/d2
D None of these

Answer: R/d2
12 For any process, the sample ranges are, 1.2,1.5,1.1,1.4,1.5. The subgroup size is 5. What will be the process standard deviation? Given: d2=2.326 and A2=0.577
A 0.576
B 2.322
C 0.511
D None of these

Answer: 0.576
13 A tolerance diagram is also called ____
A Scatter diagram
B Defect concentration diagram
C Tier chart
D Histogram

Answer: Tier chart
14 Is there any relationship between specification limits and control limits of x and R charts?
A Yes, Specification limits = Control limits
B Yes, Control limits=Specification limits/2
C No
D Yes, Control limits*0.5 = Specification limits

Answer: No
15 Control limits are ___
A Limits defined by customers
B Limits driven by the natural variability of the process
C Limits driven by the inherent variability of the process
D Statistical limits

Answer: Limits driven by the natural variability of the process
16 The natural variability of the process is measured by ____
A Process mean
B Sample standard deviation
C Process standard deviation
D Sample mean

Answer: Process standard deviation
17 What type of chart will be used to plot the number of defectives in the output of any process?
A x bar chart
B R chart
C c chart
D p chart

Answer: p chart
18 Select which option is not true about SQA…?
A Audits and reviews to be performed by the team
B Amount of technical work to be performed
C Evaluations to be performed
D All above

Answer: Evaluations to be performed
19 Which of the following is not included in prevention cost?
A equipment calibration and maintenance
B formal technical reviews
C test equipment reviews
D quality planning reviews

Answer: equipment calibration and maintenance

ADRE 2.0 FULL LENGTH MOCK TEST

Take Mock Tests

Missiles Mock Test Start Test!
SSC MTS Mock Test Start Test
IBPS CLERK MOCK TEST Start Test
SSC MTS 2022 JULY 26 Shift 1 (ENGLISH) Start Test!
SSC GD Previous Year Paper 2021 Nov 17 Shift - I (Hindi) Start Test!
SSC CGL Tier - 1 PYP 2022 April 21 Shift- 1 (ENGLISH) Start Test!
MPSC PAPER I MOCK TEST 1 (ENGLISH) Start Test!
IB Security Assistant Mock test 1 (english) Start Test!
UP POLICE CONSTABLE MOCK TEST 1 Start Test!
DELHI POLICE CONSTABLE MOCK TEST 1 (HINDI) Start Test!
Advertisement