Manual Testing Quiz | Manual Testing Objective Type Questions and Answers

(21) Which of the following is not a major task of Exit criteria?
[A] Logging the outcome of test execution.
[B] Writing a test summary report for stakeholders.
[C] Assessing if more tests are needed.
[D] Checking test logs against the exit criteria specified in test planning.
Answer: Logging the outcome of test execution.
(22) Which is the odd one out?
[A] Client or development side
[B] Client side
[C] Beta release
[D] Beta testing
Answer: Client or development side

DOWNLOAD CURRENT AFFAIRS PDF FROM APP

Article and Schedule Quiz Start Test!
(23) ______ is an existing defect that has not yet caused a failure because the conditions that is required to invoke the defect is not meet.
[A] Latent defect
[B] Masked defect
[C] Both of these
[D] None of these
Answer: Latent defect
(24) Top-down Design does not require ______ .
[A] Loop-invariants
[B] Modularity
[C] Flow charting
[D] Flow charting
Answer: Loop-invariants
(25) Which testing cannot be performed by QA Team?
[A] Fuzz Testing
[B] Destructive Testing
[C] End-to-end Testing
[D] Equivalence Partitioning Testing
Answer: Fuzz Testing
(26) STLC is related to which model?
[A] Spiral Model
[B] V Model
[C] RAD Model
[D] Waterfall Model
Answer: V Model
(27) Defects can be found more easily in ________ .
[A] Top down Integration Testing
[B] Bottom up Integration Testing
[C] Sandwich Integration Testing
[D] Big Bang Testing.
Answer: Bottom up Integration Testing
(28) Focus Testing comes under ______.
[A] Usability Testing
[B] Component Testing
[C] Acceptance Testing
[D] Performance Testing
Answer: Usability Testing
(29) Which is not true in case of Unit Testing?
[A] It is usually conducted by the development team.
[B] In this tester evaluates if individual units of source code are fit for use.
[C] It decreases the software development speed
[D] It can’t be expected to catch every error in a program.
Answer: It decreases the software development speed
(30) Which of the following is / are not a Iterative Model?
[A] V model
[B] Spiral Model
[C] Incremental
[D] RAD
Answer: V model
31 ____________ is done by suddenly increasing the load for a small period of time and observing the behavior of the system.
[A] Spike Testing
[B] Load Testing
[C] Stress Testing
[D] All of these
Answer: Spike Testing
32 Test plans are based on _______.
[A] Support Plan
[B] Business Plan
[C] Project Plan
[D] 33
Answer: Project Plan
33 Which is not a part of Decision Table?
[A] Driver portion
[B] Action portion
[C] Condition portion
[D] Stub portion
Answer: Driver portion
34 Component Drivers are not needed for ______.
[A] Top Down
[B] Modified Top Down
[C] Big-Bang
[D] Modified Sandwich
Answer: Top Down
35 Coupling and Cohesion is explained by _______ .
[A] Cause-Effect Graph
[B] Dependency Matrix
[C] Structure Graph
[D] Software Requirement Specification
Answer: Cause-Effect Graph
36 Which is not true in case of Sanity Testing?
[A] Sanity testing is High Level Testing.
[B] Sanity testing is a cursory testing.
[C] Sanity test is usually unscripted.
[D] Sanity test is a narrow regression testing.
Answer: Sanity testing is High Level Testing.
37 Confidence Testing refers to ________.
[A] Regression Testing
[B] Retesting
[C] Smoke Testing
[D] None of the above
Answer: Smoke Testing
38 Which of the following is / are not part of Specification Based Testing?
[A] Data Flow
[B] Boundary Value Analysis
[C] Decision Table
[D] State Transition
Answer: Data Flow
39 Which testing application security has the purpose to prevent problems which may affect the application integrity and stability?
[A] Fuzz Testing
[B] Vulnerability Testing
[C] Ramp Testing
[D] Penetration Testing
Answer: Vulnerability Testing
40 What is the ratio of effort needed to fixing a defect in Requirement Phase, Design Phase, Coding Phase and Implementing Phase?
[A] 1:8:12:100
[B] 1:6:10:1000
[C] 1:4:7:10
[D] 1:10:100:1000
Answer: 1:6:10:1000

Take Mock Tests

Missiles Mock Test Start Test!
SSC MTS Mock Test Start Test
IBPS CLERK MOCK TEST Start Test
SSC MTS 2022 JULY 26 Shift 1 (ENGLISH) Start Test!
SSC GD Previous Year Paper 2021 Nov 17 Shift - I (Hindi) Start Test!
SSC CGL Tier - 1 PYP 2022 April 21 Shift- 1 (ENGLISH) Start Test!
MPSC PAPER I MOCK TEST 1 (ENGLISH) Start Test!
IB Security Assistant Mock test 1 (english) Start Test!
UP POLICE CONSTABLE MOCK TEST 1 Start Test!
DELHI POLICE CONSTABLE MOCK TEST 1 (HINDI) Start Test!