April 2022

Insurance Scheme – PMGKP for health workers fighting COVID-19 extended

Insurance Scheme – PMGKP for health workers fighting COVID-19 extended

Insurance Scheme – PMGKP for health workers fighting COVID-19 extended: The ‘Pradhan Mantri Garib Kalyan Package (PMGKP), insurance scheme for Health Care Workers Fighting COVID-19’ has been extended for a further period of 180 days from 19th April, 2022. It has been decided to extend the policy so as to continue to provide the safety net

Insurance Scheme – PMGKP for health workers fighting COVID-19 extended Read More »

The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length

The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is

The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is

The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is Read More »

Scroll to Top