The item of steel work which is measured in sq.m, is
READ MORE +
The item of steel work which is measured in sq.m, is
READ MORE +
The brick work is measured in sq metre, in case of
READ MORE +
Pick up the item whose weight is added to the weight of respective item, is
READ MORE +
Pick up the item of work not included in the plinth area estimate
READ MORE +
period in a septic tank is assumed The detention
READ MORE +
The order of booking dimensions is
READ MORE +
Pick up the incorrect statement from the following
READ MORE +
The measurement is made for stone work in square metre in case of
READ MORE +
The expected out turn of 12 mm plastering with cement mortar is
READ MORE +
For the construction of buildings, the subheads of the estimate are
READ MORE +
The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as
READ MORE +
The area of the cross-section of a road fully in banking shown in the given figure, is
READ MORE +