For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is
For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is
For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is
The volume is measured correct to the nearest
The item of steel work which is measured in sq.m, is
The item of steel work which is measured in sq.m, is Read More »
The brick work is measured in sq metre, in case of
The brick work is measured in sq metre, in case of Read More »
Pick up the item whose weight is added to the weight of respective item, is
Pick up the item whose weight is added to the weight of respective item, is Read More »
Pick up the item of work not included in the plinth area estimate
Pick up the item of work not included in the plinth area estimate Read More »
period in a septic tank is assumed The detention
period in a septic tank is assumed The detention Read More »
The order of booking dimensions is
Pick up the incorrect statement from the following
Pick up the incorrect statement from the following Read More »
The measurement is made for stone work in square metre in case of
The measurement is made for stone work in square metre in case of Read More »