Pick up the correct statement from the following
Pick up the correct statement from the following
Pick up the correct statement from the following Read More »
Pick up the correct statement from the following
Pick up the correct statement from the following Read More »
The expected out turn of 2.5 cm cement concrete floor per mansion per day
The expected out turn of 2.5 cm cement concrete floor per mansion per day Read More »
The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is
Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds
The value of ‘A’ of Indian type W.C. shown in the given figure is
The value of ‘A’ of Indian type W.C. shown in the given figure is Read More »
The area is measured correct to the nearest
Pick up the incorrect statement from the following
Pick up the incorrect statement from the following Read More »
Pick up the correct statement from the following
Pick up the correct statement from the following Read More »
The cross -section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is
Pick up the correct statement regarding the centre line method of estimating a building
Pick up the correct statement regarding the centre line method of estimating a building Read More »