Two design options of a business building on a 10.0 hectare site are being compared for built-up area

Two design options of a business building on a 10.0 hectare site are being compared for built-up area

Q. Two design options of a business building on a 10.0 hectare site are being compared for built-up area. Floor to floor height of Option A is 3.6 m and that of Option B is 4.5 m. If the maximum allowable building height is 45 m with same ground coverage for both options, the additional […]

Two design options of a business building on a 10.0 hectare site are being compared for built-up area Read More »

The indoor illumination requirement for a building is 350 Lux. If the daylight factor is 2.7

The indoor illumination requirement for a building is 350 Lux. If the daylight factor is 2.7

Q. The indoor illumination requirement for a building is 350 Lux. If the daylight factor is 2.7 and the design sky illuminance is 9000 Lux, then the required supplementary artificial lighting is________Lux. Ans: 107 to 107 Sol: The three components contributing to daylight factor are: (a) sky component (SC), (b) externally reflected component (ERC), and

The indoor illumination requirement for a building is 350 Lux. If the daylight factor is 2.7 Read More »

The live load and dead load in a three storeyed residential building, transferred through a single column

The live load and dead load in a three storeyed residential building, transferred through a single column

Q. The live load and dead load in a three storeyed residential building, transferred through a single column, is 12 tons and 18 tons respectively. If the soil bearing capacity is 10 ton/sqm and the factor of safety is 1.5, the area of column footing is sqm Ans: 4.0 to 5.0 Sol: Given, Live load = 12 ton. Dead load = 18 ton.Total load = 30 ton.Factor of

The live load and dead load in a three storeyed residential building, transferred through a single column Read More »

In India, for 1.0 cum of M-20 grade concrete, the number of cement bags required is_______

In India, for 1.0 cum of M-20 grade concrete, the number of cement bags required is_______

Q. In India, for 1.0 cum of M-20 grade concrete, the number of cement bags required is____________(up to two decimal places). Ans: 5 to 9 Sol: Composition of M20 grade of concrete is 1:1.5:3 (Cement: Sand : Aggregate) (Total 5.5) i.e. 5.5-unit volume of M20 grade of concrete contains 1-unit volume of cement.Thus, 1 cu.m.

In India, for 1.0 cum of M-20 grade concrete, the number of cement bags required is_______ Read More »

The water consumption of a high rise apartment building with 60 dwelling units having an average household size of 5 persons is 135 lpcd

The water consumption of a high rise apartment building with 60 dwelling units having an average household size of 5 persons is 135 lpcd

Q. The water consumption of a high rise apartment building with 60 dwelling units having an average household size of 5 persons is 135 lpcd. Assuming 80% of the total use is met with recycled water supply, the daily domestic demand for the building is_________litres. Ans: 8100 to 8100 Sol: Total dwelling units = 60.Average

The water consumption of a high rise apartment building with 60 dwelling units having an average household size of 5 persons is 135 lpcd Read More »

For an activity, ‘optimistic time duration’ is 4 days, ‘pessimistic time duration’ is 11 days and ‘most-likely time duration’ is 8 days

For an activity, ‘optimistic time duration’ is 4 days, ‘pessimistic time duration’ is 11 days and ‘most-likely time duration’ is 8 days

Q. For an activity, ‘optimistic time duration’ is 4 days, ‘pessimistic time duration’ is 11 days and ‘most-likely time duration’ is 8 days. The PERT value of time duration is________days Ans: 7.8 to 7.9 PERT value of time duration/Expected time (te)

For an activity, ‘optimistic time duration’ is 4 days, ‘pessimistic time duration’ is 11 days and ‘most-likely time duration’ is 8 days Read More »

A 5m × 5m × 3m room has four 230 mm thick external brick walls. Total wall fenestration is 10 sqm

A 5m × 5m × 3m room has four 230 mm thick external brick walls. Total wall fenestration is 10 sqm

Q. A 5m × 5m × 3m room has four 230 mm thick external brick walls. Total wall fenestration is 10 sqm. The temperature difference between indoor and outdoor is 2 degC. The air to air transmittance values for 230 mm thick brick wall and 200 mm thick aerated concrete block wall are 2.4 and

A 5m × 5m × 3m room has four 230 mm thick external brick walls. Total wall fenestration is 10 sqm Read More »

An isolated enclosure shown in the Figure has inlet P and outlet Q of 2 sqm each

An isolated enclosure shown in the Figure has inlet P and outlet Q of 2 sqm each

Q. An isolated enclosure shown in the Figure has inlet P and outlet Q of 2 sqm each, on the opposite walls. The outdoor wind speed is 5 m/sec. If the coefficient of effectiveness is 0.6, the rate of natural ventilation in the enclosure due to wind action is                                                                              cum/hr. Ans: 21600 to 21600 Sol:

An isolated enclosure shown in the Figure has inlet P and outlet Q of 2 sqm each Read More »