Which one of the following pairs is wrongly matched while the remaining three are correct?

Which one of the following pairs is wrongly matched while the remaining three are correct?  [AIPMT MAINS 2011]

Which one of the following pairs is wrongly matched while the remaining three are correct?  [AIPMT MAINS 2011] Option 1 : Penicillium              –      ConidiaOption 2 : Water hyacinth    –      RunnerOption 3 : Bryophyllum          –      Leaf budsOption 4 : Agave                      –      Bulbils

Which one of the following pairs is wrongly matched while the remaining three are correct?  [AIPMT MAINS 2011] Read More »

In India, for 1.0 cum of M-20 grade concrete, the number of cement bags required is_______

In India, for 1.0 cum of M-20 grade concrete, the number of cement bags required is_______

Q. In India, for 1.0 cum of M-20 grade concrete, the number of cement bags required is____________(up to two decimal places). Ans: 5 to 9 Sol: Composition of M20 grade of concrete is 1:1.5:3 (Cement: Sand : Aggregate) (Total 5.5) i.e. 5.5-unit volume of M20 grade of concrete contains 1-unit volume of cement.Thus, 1 cu.m.

In India, for 1.0 cum of M-20 grade concrete, the number of cement bags required is_______ Read More »

The water consumption of a high rise apartment building with 60 dwelling units having an average household size of 5 persons is 135 lpcd

The water consumption of a high rise apartment building with 60 dwelling units having an average household size of 5 persons is 135 lpcd

Q. The water consumption of a high rise apartment building with 60 dwelling units having an average household size of 5 persons is 135 lpcd. Assuming 80% of the total use is met with recycled water supply, the daily domestic demand for the building is_________litres. Ans: 8100 to 8100 Sol: Total dwelling units = 60.Average

The water consumption of a high rise apartment building with 60 dwelling units having an average household size of 5 persons is 135 lpcd Read More »

For an activity, ‘optimistic time duration’ is 4 days, ‘pessimistic time duration’ is 11 days and ‘most-likely time duration’ is 8 days

For an activity, ‘optimistic time duration’ is 4 days, ‘pessimistic time duration’ is 11 days and ‘most-likely time duration’ is 8 days

Q. For an activity, ‘optimistic time duration’ is 4 days, ‘pessimistic time duration’ is 11 days and ‘most-likely time duration’ is 8 days. The PERT value of time duration is________days Ans: 7.8 to 7.9 PERT value of time duration/Expected time (te)

For an activity, ‘optimistic time duration’ is 4 days, ‘pessimistic time duration’ is 11 days and ‘most-likely time duration’ is 8 days Read More »

A 5m × 5m × 3m room has four 230 mm thick external brick walls. Total wall fenestration is 10 sqm

A 5m × 5m × 3m room has four 230 mm thick external brick walls. Total wall fenestration is 10 sqm

Q. A 5m × 5m × 3m room has four 230 mm thick external brick walls. Total wall fenestration is 10 sqm. The temperature difference between indoor and outdoor is 2 degC. The air to air transmittance values for 230 mm thick brick wall and 200 mm thick aerated concrete block wall are 2.4 and

A 5m × 5m × 3m room has four 230 mm thick external brick walls. Total wall fenestration is 10 sqm Read More »

An isolated enclosure shown in the Figure has inlet P and outlet Q of 2 sqm each

An isolated enclosure shown in the Figure has inlet P and outlet Q of 2 sqm each

Q. An isolated enclosure shown in the Figure has inlet P and outlet Q of 2 sqm each, on the opposite walls. The outdoor wind speed is 5 m/sec. If the coefficient of effectiveness is 0.6, the rate of natural ventilation in the enclosure due to wind action is                                                                              cum/hr. Ans: 21600 to 21600 Sol:

An isolated enclosure shown in the Figure has inlet P and outlet Q of 2 sqm each Read More »

Scroll to Top