Which one of the following pairs is wrongly matched while the remaining three are correct?

Which one of the following pairs is wrongly matched while the remaining three are correct?  [AIPMT MAINS 2011]

Which one of the following pairs is wrongly matched while the remaining three are correct?  [AIPMT MAINS 2011] Option 1 : Penicillium              –      ConidiaOption 2 : Water hyacinth    –      RunnerOption 3 : Bryophyllum          –      Leaf budsOption 4 : Agave                      –      Bulbils

Which one of the following pairs is wrongly matched while the remaining three are correct?  [AIPMT MAINS 2011] Read More »

In India, for 1.0 cum of M-20 grade concrete, the number of cement bags required is_______

In India, for 1.0 cum of M-20 grade concrete, the number of cement bags required is_______

Q. In India, for 1.0 cum of M-20 grade concrete, the number of cement bags required is____________(up to two decimal places). Ans: 5 to 9 Sol: Composition of M20 grade of concrete is 1:1.5:3 (Cement: Sand : Aggregate) (Total 5.5) i.e. 5.5-unit volume of M20 grade of concrete contains 1-unit volume of cement.Thus, 1 cu.m.

In India, for 1.0 cum of M-20 grade concrete, the number of cement bags required is_______ Read More »

The water consumption of a high rise apartment building with 60 dwelling units having an average household size of 5 persons is 135 lpcd

The water consumption of a high rise apartment building with 60 dwelling units having an average household size of 5 persons is 135 lpcd

Q. The water consumption of a high rise apartment building with 60 dwelling units having an average household size of 5 persons is 135 lpcd. Assuming 80% of the total use is met with recycled water supply, the daily domestic demand for the building is_________litres. Ans: 8100 to 8100 Sol: Total dwelling units = 60.Average

The water consumption of a high rise apartment building with 60 dwelling units having an average household size of 5 persons is 135 lpcd Read More »

Scroll to Top