Manual Testing Quiz | Manual Testing Objective Type Questions and Answers

Questions
21 Which of the following is not a major task of Exit criteria?
A Logging the outcome of test execution.
B Writing a test summary report for stakeholders.
C Assessing if more tests are needed.
D Checking test logs against the exit criteria specified in test planning.

Answer: Logging the outcome of test execution.
22 Which is the odd one out?
A Client or development side
B Client side
C Beta release
D Beta testing

Answer: Client or development side
Advertisement
Article and Schedule Quiz Start Test!

DOWNLOAD CURRENT AFFAIRS PDF FROM APP

23 ______ is an existing defect that has not yet caused a failure because the conditions that is required to invoke the defect is not meet.
A Latent defect
B Masked defect
C Both of these
D None of these

Answer: Latent defect
24 Top-down Design does not require ______ .
A Loop-invariants
B Modularity
C Flow charting
D Flow charting

Answer: Loop-invariants
25 Which testing cannot be performed by QA Team?
A Fuzz Testing
B Destructive Testing
C End-to-end Testing
D Equivalence Partitioning Testing

Answer: Fuzz Testing
26 STLC is related to which model?
A Spiral Model
B V Model
C RAD Model
D Waterfall Model

Answer: V Model
27 Defects can be found more easily in ________ .
A Top down Integration Testing
B Bottom up Integration Testing
C Sandwich Integration Testing
D Big Bang Testing.

Answer: Bottom up Integration Testing
28 Focus Testing comes under ______.
A Usability Testing
B Component Testing
C Acceptance Testing
D Performance Testing

Answer: Usability Testing
29 Which is not true in case of Unit Testing?
A It is usually conducted by the development team.
B In this tester evaluates if individual units of source code are fit for use.
C It decreases the software development speed
D It can’t be expected to catch every error in a program.

Answer: It decreases the software development speed
30 Which of the following is / are not a Iterative Model?
A V model
B Spiral Model
C Incremental
D RAD

Answer: V model
31 ____________ is done by suddenly increasing the load for a small period of time and observing the behavior of the system.
A Spike Testing
B Load Testing
C Stress Testing
D All of these

Answer: Spike Testing
32 Test plans are based on _______.
A Support Plan
B Business Plan
C Project Plan
D 33

Answer: Project Plan
33 Which is not a part of Decision Table?
A Driver portion
B Action portion
C Condition portion
D Stub portion

Answer: Driver portion
34 Component Drivers are not needed for ______.
A Top Down
B Modified Top Down
C Big-Bang
D Modified Sandwich

Answer: Top Down
35 Coupling and Cohesion is explained by _______ .
A Cause-Effect Graph
B Dependency Matrix
C Structure Graph
D Software Requirement Specification

Answer: Cause-Effect Graph
36 Which is not true in case of Sanity Testing?
A Sanity testing is High Level Testing.
B Sanity testing is a cursory testing.
C Sanity test is usually unscripted.
D Sanity test is a narrow regression testing.

Answer: Sanity testing is High Level Testing.
37 Confidence Testing refers to ________.
A Regression Testing
B Retesting
C Smoke Testing
D None of the above

Answer: Smoke Testing
38 Which of the following is / are not part of Specification Based Testing?
A Data Flow
B Boundary Value Analysis
C Decision Table
D State Transition

Answer: Data Flow
39 Which testing application security has the purpose to prevent problems which may affect the application integrity and stability?
A Fuzz Testing
B Vulnerability Testing
C Ramp Testing
D Penetration Testing

Answer: Vulnerability Testing
40 What is the ratio of effort needed to fixing a defect in Requirement Phase, Design Phase, Coding Phase and Implementing Phase?
A 1:8:12:100
B 1:6:10:1000
C 1:4:7:10
D 1:10:100:1000

Answer: 1:6:10:1000

ADRE 2.0 FULL LENGTH MOCK TEST

Take Mock Tests

Missiles Mock Test Start Test!
SSC MTS Mock Test Start Test
IBPS CLERK MOCK TEST Start Test
SSC MTS 2022 JULY 26 Shift 1 (ENGLISH) Start Test!
SSC GD Previous Year Paper 2021 Nov 17 Shift - I (Hindi) Start Test!
SSC CGL Tier - 1 PYP 2022 April 21 Shift- 1 (ENGLISH) Start Test!
MPSC PAPER I MOCK TEST 1 (ENGLISH) Start Test!
IB Security Assistant Mock test 1 (english) Start Test!
UP POLICE CONSTABLE MOCK TEST 1 Start Test!
DELHI POLICE CONSTABLE MOCK TEST 1 (HINDI) Start Test!
Advertisement
Assam Direct Recruitment Test Series