JOIN ADRE 2.0 Telegram Group

Manual Testing Quiz | Manual Testing Multiple Choice Questions and Answers

Questions
1 Retesting of a single program or component after a change has been made?
A Unit Regression
B Retesting
C Regional Regression
D Full Regression Testing

Answer: Unit Regression
2 Name the events that will be analyzed, Count the named incidents, Rank the count by frequency using a bar chart & Validate reasonableness of the analysis is called as
A Pie Charts
B SWOT Analysis
C Pareto Analysis
D Cause and Effect Diagram

Answer: Pareto Analysis
Advertisement
ADRE 2.0 Mock Test - 5 Start Test
ADRE 2.0 Mock Test - 5 Start Test

DOWNLOAD CURRENT AFFAIRS PDF FROM APP

3 White box testing is not called as___________
A Clear box testing
B OPen box testing
C Closed box testing
D Glass box testing

Answer: Closed box testing
4 It measures the quality of processes used to create a quality product. It is a system of management activities, It is a preventive process, It applies for entire life cycle & Deals with Process.
A Quality Control
B Quality Assurance
C Verification
D Validation

Answer: Quality Assurance
5 What are the Testing Levels?
A System Testing and Acceptance Testing.
B Integration Testing
C Unit Testing
D All the above

Answer: All the above
6 A Non-Functional Software testing done to check if the user interface is easy to use and understand
A Security Testing
B Unit testing
C Block Box Testing
D Usability Testing

Answer: Usability Testing
7 It is a set of levels that defines a testing maturity hierarchy
A TMM (Testing Maturity Model)
B TQM(Total Quality Management)
C TIM (Testing Improving Model)
D All of the above

Answer: TMM (Testing Maturity Model)
8 To check whether we have developed the product according to the customer requirements r not. It is a Dynamic process.
A Quality Control
B Quality Assurance
C Validation
D Verification

Answer: Validation
9 To check whether we are developing the right product according to the customer requirements are not. It is a static process
A Verification
B Quality Control
C Quality Assurance
D Validation

Answer: Verification
10 Executing the same test case by giving the number of inputs on same build called as
A Sanity Testing
B Ad hoc Testing
C Regression Testing
D ReTesting

Answer: ReTesting
11 The approach/document used to make sure all the requirements are covered when writing test cases
A Traceability Matrix
B Test bed
C Checklist
D Test Matrix

Answer: Traceability Matrix
12 The Switch is switched off once the temperature falls below 18 and then it is turned on when the temperature is more than 21. Identify the Equivalence values which belong to the same class.
A 22,23,24
B 14,15,19
C 24,27,17
D 12,16,22

Answer: 22,23,24
13 Handover of Test-ware is a part of which Phase
A Test Closure Activities
B Evaluating exit criteria and reporting
C Test Planning and control
D Test Analysis and Design

Answer: Test Closure Activities
14 Which of the following items would not come under Configuration Management?
A live data
B user requirement document
C test documentation
D operating systems

Answer: live data
15 Reporting Discrepancies as incidents is a part of which phase :-
A Evaluating exit criteria and reporting
B Test Closure Activities
C Test Analysis and Design
D Test Implementation and execution

Answer: Test Implementation and execution
16 Reviewing the test Basis is a part of which phase
A Evaluating exit criteria and reporting
B Test Closure Activities
C Test Analysis and Design
D Test Implementation and execution

Answer: Test Analysis and Design
17 One of the fields on a form contains a text box which accepts alpha numeric values. Identify the Valid Equivalence class
A Boo01k
B book
C Book
D BOOK

Answer: Boo01k
18 Static analysis is best described as:
A The analysis of program code.
B The use of black box testing.
C The reviewing of test plans.
D The analysis of batch programs.

Answer: The analysis of program code.
19 Testing activity which is performed to expose defects in the interfaces and in the interaction between integrated components is :-
A Integration Level Testing
B Component Testing
C System Level Testing
D Unit Level Testing

Answer: Integration Level Testing
20 Testing where in we subject the target of the test , to varying workloads to measure and evaluate the performance behaviors and ability of the target and of the test to continue to function properly under these different workloads.
A Usability Testing
B System Testing
C Load Testing
D Integration Testing

Answer: Load Testing

ADRE 2.0 MOCK TEST

Take Mock Tests

Government Schemes Mock Test Start Test!
Political Science Mock Test – 42 Start Test
History Test – 190 Start Test
Quantitative Aptitude Test Start Test!
Trigonometry - Mock Test Start Test!
Data Interpretation - Mock Test Start Test!
General Awareness - Mock Test Start Test!
Reasoning Ability - Mock Test Start Test!
Englist(Antonyms) Mock Test 1 Start Test!
Quantitative Aptitude (Percentage) Mock Test Start Test!
Economy Mock Test 1 Unlock Test!
Books & Authors - Test 2 Unlock Test!
Advertisement