JOIN ADRE 2.0 Telegram Group

Material Management MCQs | Material Management Multiple Choice Questions with Answers

Questions
61 In purchasing an item or service from a supplier, which factor is not included when specifications are being developed?
A Quantity requirements
B Price requirements
C Delivery requirement
D Functional requirement

Answer: Delivery requirement
62 Buying of the annual requirements of an item during its season.
A Speculative Buying
B Seasonal Buying
C Hand to mouth buying
D Tender Buying

Answer: Speculative Buying
Advertisement
Article and Schedule Quiz Start Test!

DOWNLOAD CURRENT AFFAIRS PDF FROM APP

63 Finance must keep investment and costs low. This can be done by___________
A Decreasing the number of plants and warehouses
B Producing small quantities
C Increasing inventory so inventory investment is at a maximum
D Using short production runs

Answer: Decreasing the number of plants and warehouses
64 It is possible to increase the available capacity by:
A Limiting subcontracting
B Using fewer workers
C Rerouting away from other work centers
D Scheduling overtime

Answer: Scheduling overtime
65 In the __________________ environment, many different end items are made from a small number of components.
A make-to-order
B make-to-stock
C assembly-to-order
D engineer-to-order

Answer: make-to-order
66 A _________ is used when companies usually make more than one product and the same components are often used in several products.
A multiple bill
B single-level bill
C multilevel bill
D None of the above

Answer: multiple bill
67 __________ are purchased items received that have not entered the production process. They include purchased materials, component parts, and sub-assemblies.
A Work-in-process
B MRO supplies
C Finished goods
D Raw materials

Answer: Raw materials
68 ___________ include hand tools, spare parts, lubricants, and cleaning supplies.
A MRO supplies
B Raw materials
C Work-in-process
D Finished goods

Answer: MRO supplies
69 __________ inventory is held to cover random unpredictable changes in supply and demand or lead time.
A Fluctuation
B Anticipation
C Transportation
D Lot-size

Answer: Fluctuation
70 A(n) _____________ lists all the parts needed to make one complete assembly.
A indented bill
B multilevel bill
C single-level bill
D summarized parts list

Answer: summarized parts list
71 The Gregorian calendar:
A Has an equal number of days per month
B Works on a decimal base
C Spreads holidays evenly throughout the year
D Resource planning

Answer: Presents problems for manufacturing planning and control
72 The term _____________means that the work center is overloaded and the term ________________ means the work center is under loaded.
A overcapacity, under capacity
B undercapacity, overcapacity
C utilization, under capacity
D overcapacity, utilization

Answer: overcapacity, under capacity
73 ______________is concerned with the production of high-volume standard products.
A Intermittent manufacturing
B Product manufacturing
C Flow manufacturing
D All of the above

Answer: Flow manufacturing
74 An example of project manufacturing is:
A Large shipbuilding
B Gasoline
C Automobiles
D Appliances

Answer: Large shipbuilding
75 The _________________ collects all of the relevant data on a work center.
A item master file
B product structure file (bill of material file)
C work center master file
D routing file

Answer: work center master file
76 _________ is the amount of time the job is waiting at a work center before an operation begins.
A Setup time
B Run time
C Wait time
D Queue time

Answer: Queue time
77 A ________________ is a legal offer to purchase.
A purchase order
B quotation
C receiving order
D supplier's invoice

Answer: purchase order
78 ___________specifications and standard specifications are the two major sources of specifications or ways of describing a product.
A Buyer
B Marketing
C Production
D Functional

Answer: Buyer
79 Trends:
A Are level
B Have no change from period to period
C Can rise or fall
D All of the above

Answer: All of the above
80 Raw Materials and WIP can be classified under-
A Direct Material
B Indirect Material
C Finished Material
D Standard Parts

Answer: Direct Material

ADRE 2.0 FULL LENGTH MOCK TEST

Take Mock Tests

Missiles Mock Test Start Test!
SSC MTS Mock Test Start Test
IBPS CLERK MOCK TEST Start Test
SSC MTS 2022 JULY 26 Shift 1 (ENGLISH) Start Test!
SSC GD Previous Year Paper 2021 Nov 17 Shift - I (Hindi) Start Test!
SSC CGL Tier - 1 PYP 2022 April 21 Shift- 1 (ENGLISH) Start Test!
MPSC PAPER I MOCK TEST 1 (ENGLISH) Start Test!
IB Security Assistant Mock test 1 (english) Start Test!
UP POLICE CONSTABLE MOCK TEST 1 Start Test!
DELHI POLICE CONSTABLE MOCK TEST 1 (HINDI) Start Test!
Advertisement
Assam Direct Recruitment Test Series