Assertion A : When rock conditions are favorable, it will not be necessary to take up concrete lining concurrently with the driving operations till the full length of the tunnel has been driven through rock.
Reason R : A tunnel through rock, hard or soft, does not need any concrete lining.
Select your answer based on the coding system given below:Answer: A is true but R is false.
Answer: cutting edge
Answer: excavation being done along the periphery
Answer: Tunnelling can be continuous and the work can be expedited.
1. Soil is soft.
2. Volume of existing surface traffic on the alignment is heavy.
3. Track is at a deeper level.
4. Water table is high.
In the construction of Metro Railways, “Cut and Cover” method of construction is suitable in situations listed atAnswer: 1 and 4
1. marking tunnel profile
2. loading explosives and blasting
3. checking misfire
4. mucking
5. removing foul gas
6. setting up and drilling
7. guniting
Select the correct answer using the codes given below. Codes:Answer: 1,6,2,5,3,4,7