The probability of completing the project can be estimated based upon the ____ .
Answer:Normal distribution curve.
2
In the initial stage of the project the probability of completing the project is ___ .
Answer: Low
⭐ Make GKSeries Your Preferred Source on Google
Add GKSeries as Preferred Source
3
The entire process of a project may be considered to be made up on number of sub process placed in different stage called the
Answer: Work Breakdown Structure (WBS).
4
Tool used for comparison of the proposed project to complete projects of a similar nature whose costs are known.
Answer: Analogy
5
Each component of the software product is separately estimated and the results aggregated to produce an estimate for the overall job.
Answer:Bottom-up
6
Following is (are) the component(s) of risk management
Answer: All of the above
7
Following are the characteristics of Project Mindset.
Answer:Time, Responsiveness, Information sharing, Processes, structured planning
8
“Devising and maintaining a workable scheme to accomplish the business need” is
Answer: Planning process
10
Following is (are) the tool(s) for changing a process
Answer:Both (A) and (B)