Production and Operations Management Multiple Choice Questions and Answers | Production and Operations Management MCQs

(1) Which kind of defect can be called as minor defect?
[A] Which does not reduce the usability of the product for its intended use
[B] The cost of repairing the defect is less
[C] Both (A) and (B)
[D] None of the above
Answer: Which does not reduce the usability of the product for its intended use
(2) General Electric Matrix is divided into how many cells
[A] 4
[B] 9
[C] 16
[D] 25
Answer: 9
(3) What is the reason of excessive friction between parts?
[A] Improper or lack of lubrication
[B] Material of parts
[C] both (A) and (B)
[D] None of above
Answer: Improper or lack of lubrication
(4) Capacity decisions have a direct influence on performance of production system in respect of –––––––––
[A] Delivery performance
[B] Quality control
[C] Plant size
[D] Manpower
Answer: Delivery performance
(5) Business is rated on which dimensions
[A] Market attractiveness
[B] Business strength
[C] both (A) and (B)
[D] none of the above
Answer: both (A) and (B)
(6) Which of the following policies is advisable in case of low product variety and large volumes?
[A] Skilled labour, special purpose machines
[B] Low skilled labour, general purpose machine
[C] Low Skilled Labour, Special Purpose Machines
[D] Any of the above
Answer: Low Skilled Labour, Special Purpose Machines
(7) In an organization there may not be a formal PPC department if
[A] Work is highly repetitive in nature
[B] Planning activities are performed by the line staff
[C] Number of workmen is not very large
[D] All of the above
Answer: All of the above
(8) 'W' in SWOT stands for
[A] What do you do well?
[B] What could you improve?
[C] What doors are open to you?
[D] What threats could harm you
Answer: What could you improve?
(9) Which kind of labour force is required in case of Jobbing Production?
[A] Highly Skilled
[B] Semi skilled
[C] Unskilled
[D] Any of the above
Answer: Highly Skilled
(10) Limitations of Traditional cost accounting areWhich of the following is not the characteristic of Project Production?
[A] Continuous flow of material
[B] Highly mechanised material handling
[C] Virtually zero manufacturing cycle time
[D] All of the above
Answer: All of the above