21 For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is
A 0.94 m3
B 1.00 m3
C 0.98 m3
D 0.90 m3

Answer: 0.94 m3
22 Size, capacity and materials need be specified for
A Ball valves
B Bib-cocks
C Stop-cocks
D All the above

Answer: All the above
Advertisement
Article and Schedule Quiz Start Test!

DOWNLOAD CURRENT AFFAIRS PDF FROM APP

23 Berms are provided in canals if these are
A Partly in excavation and partly in embankment
B Fully in embankment
C Fully in excavation
D All the above

Answer: Partly in excavation and partly in embankment
24 The rate of payment is made for 100 cu m (per % cu m) in case of
A Excavation in trenches for foundation
B Earth work in excavation
C Rock cutting
D All the above

Answer: All the above
25 The main factor to be considered while preparing a detailed estimate, is
A Quantity of the materials
B Availability of materials
C Transportation of materials
D All the above

Answer: All the above
26 If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by
A Prismoidal formula
B Mid-section formula
C Trapezoidal formula
D All the above

Answer: All the above
27 While estimating the qualities for the construction of a building, the correct metric unit is
A Litre for capacity
B Square metres for volume
C Cubic metre for area
D None of these

Answer: Litre for capacity
28 In the mid-section formula
A The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections
B The area of mid-sections is calculated by using mean depth
C The mean depth is the average of depths of two consecutive sections
D All of the above

Answer: All of the above
29 Referring of given figure, pick up the correct statement from the following:
A Length of short walls in-to-in is 3.20 m
B The total length of centre line of four walls is 20 m
C Length of long wall out-to -out is 6.80 m
D All the above

Answer: All the above
30 According to Indian Standards Institute, the actual size of modular bricks is
A 19 cm × 9 cm × 9 cm
B 20 cm × 10 cm × 10 cm
C 25 cm × 13 cm × 7.5 cm
D 23 cm × 11.5 cm × 7.5 cm

Answer: 19 cm × 9 cm × 9 cm
31 The following item of earth work is not measured separately.
A Steps in deep excavation
B Site clearance
C Setting out of works
D All the above

Answer: All the above
32 The measurement is made in square metre in case of
A Hollow concrete block wall
B R.C.C. structure
C Cement concrete in foundation
D None of these

Answer: None of these
33 Cost of fittings and their fixing is specified for the following sanitary fittings
A Lavatory basins
B Flushing pipes
C Water closets
D All the above

Answer: All the above
34 Pick up the correct statement from the following:
A Glazing is measured in sq.m
B Plastering is measured in sq.m
C Pointing is measured in sq.m
D All the above

Answer: All the above
35 The value of ‘B’ of Indian type W.C. shown in the given figure is:
A 30 cm
B 50 cm
C 45 cm
D None

Answer: 45 cm
36 Pick up the excavation where measurements are made in square metres for payment.
A Ordinary cuttings up to 1 m
B Surface dressing up to 15 cm depths
C Surface excavation up to 30 cm depths
D Both B. and C.

Answer: Both B. and C.
37 In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and
A Half breadth of wall on each side
B One fourth breadth of wall on each side
C Breadth of the wall
D None of these

Answer: Half breadth of wall on each side
38 The measurement is not made in square metres in case of
A R.C. Chhajja
B D.P.C. (Damp proof course)
C Concrete Jeffries
D Form works

Answer: R.C. Chhajja
39 The trap which is provided to disconnect the house drain from the street sewer is called
A Interception manhole
B Intercepting trap
C Master trap
D All the above

Answer: All the above
40 While preparing a detailed estimate
A Volume should be measured correct to 0.01 cum
B Area should be measured correct to 0.01 sqm
C Dimension should be measured correct to 0.01 m
D All the above

Answer: All the above

ADRE 2.0 FULL LENGTH MOCK TEST

Take Mock Tests

Missiles Mock Test Start Test!
SSC MTS Mock Test Start Test
IBPS CLERK MOCK TEST Start Test
SSC MTS 2022 JULY 26 Shift 1 (ENGLISH) Start Test!
SSC GD Previous Year Paper 2021 Nov 17 Shift - I (Hindi) Start Test!
SSC CGL Tier - 1 PYP 2022 April 21 Shift- 1 (ENGLISH) Start Test!
MPSC PAPER I MOCK TEST 1 (ENGLISH) Start Test!
IB Security Assistant Mock test 1 (english) Start Test!
UP POLICE CONSTABLE MOCK TEST 1 Start Test!
DELHI POLICE CONSTABLE MOCK TEST 1 (HINDI) Start Test!
Advertisement
Assam Direct Recruitment Test Series